What should the TPO substrate acceptance record identify?
Identify the actual surface receiving each layer and the findings that must be resolved before it is covered.
Read full answer: What should the TPO substrate acceptance record identify?
Separate the structural deck from insulation, cover board and any existing roof surface that remains. These are different receiving conditions. Ask how the proposed attachment reaches or bonds to its specified substrate and which investigation supports that choice. Record uncertain deck types or concealed deterioration as open questions rather than filling the gap with an assumed standard assembly.
Set a documentation point for exposed conditions and repair decisions. Keep location photographs, the proposed correction and authorization together. If the accepted assembly changes because of the findings, update the product and attachment schedules as well as the estimate. A material name on the membrane wrapper cannot establish that the underlying surface was suitable or that every supporting layer matched the reviewed design.

