Your privacy choices

Booking and estimate requests work without optional tracking. Tracking starts off on each page load. Allow analytics and session replay for this page, or choose advertising separately.

A saved choice never turns tracking on after a reload. Change or withdraw permission using “Privacy choices” in the footer; changing loaded tracking reloads the page with tracking off. Read our privacy notice.

Skip to content
Peak Elevation ExteriorsPlan a roofing visitBook
Shingle roof, green gable, garage and roof-edge gutter
Roof covering, eave and adjoining garage.
Colorado roof replacement

A new roof. A complete replacement plan.

A new roof starts with the right plan. Explore materials, understand what is included and know how your home will be protected through the work.

Material choice is one part of the plan.Shingle / Metal / Tile / Related roof-edge work
Before a roof comes off

Plan the roof.
And the work around it.

Replacing shingles is only part of replacing a roof. The proposal should identify the work beneath them, how roof transitions are handled and what happens if tear-off exposes damaged decking. We put those decisions into the scope before scheduling.

01

Know what comes off

Identify existing roof layers, tear-off limits and debris access. Discuss how the building will be protected while the roof is open and weather affects the sequence.

02

Choose the assembly

Compare the selected roof covering with compatible underlayment, flashing, edge details and ventilation requirements. Product names and colors belong in the written estimate.

03

Plan for the hidden parts

Deck damage cannot always be established before removal. Agree the authorization process and any decking unit prices or allowances before additional work begins.

Roof replacement / The days around the work

Plan more than the day the shingles arrive.

The roofing sequence has work on either side of it: access, removal, decisions at the exposed deck and the equipment that returns to the roof afterward.

Before the roof is opened

Who removes solar panels before a roof replacement?

Confirm responsibility with the solar provider before setting the reroof date. In Arvada, the City specifically directs owners to the original solar installer for panel removal before roofing begins. Other Colorado authorities and system agreements can have their own requirements.

Keep removal, storage, new roof attachments, reinstallation and any inspection or electrical work as separate named responsibilities. A reroof estimate should not imply that all solar work is included.

Dark shingle roof beside a stone chimney and upper windows
Shingle courses at a gable and chimney.
Life around the work

Can I stay home while the roof is replaced?

Discuss noise, falling-debris boundaries, pets, parking and the entrances that must remain usable. Ask which days need an empty driveway or a restricted outdoor area. Arrange any special access needs before the first delivery rather than relying on a general promise about disruption.

When the plan changes

What if the schedule changes after tear-off?

Agree on the contact person, the temporary weather-protection plan and the authorization process for additional work. If a concealed condition changes the sequence, keep its photos, proposed correction and revised timing together before it is covered.

Your next roof

Planning your roof replacement.

Explore the roof beneath the shingles, then find answers about removal, deck repairs, flashing and the work around your home.

Beneath the shingles

What tear-off reveals.

Roof tear-off showing remaining shingles, a dark sheet layer and an exposed patch of wood decking.
01Existing shingles
The roof covering before removal.
02Layer beneath
The sheet layer between the covering and deck.
03Wood decking
Exposed areas where the deck can be reviewed.

Planning a roof replacement in Colorado?

Get a roof replacement estimate
Before you choose your roof

Your questions, answered.

Will the old roof need to come off?

Treat tear-off and recover as different proposals. A recover option needs evidence that the existing assembly, condition and applicable requirements allow it; a lower removal cost does not establish suitability.

Read full answer: Should the existing roof be torn off or covered over?

Ask what is known about the existing layers, attachment, moisture history and deck. Removal can reveal conditions that a surface review cannot confirm. A recover can also change the height relationship at edges, walls and penetrations, so its connections need a defined plan.

NRCA describes both replacement and recover as reroofing options, subject to applicable limitations. Ask the proposal to name which areas are removed, what stays in place and how inaccessible conditions affect the recommendation. Do not assume an aerial measurement report supplies that condition evidence, or that a previous recover makes another one permissible.

Scroll the comparison to see every column.

Two proposals that require different evidence
DecisionTear-off proposalRecover proposal
Existing roofRemoval extent and disposalLayers and conditions retained
DeckReview after exposureBasis for judging suitability
ConnectionsRebuild boundaryHeight and tie-in adjustments

Primary referencesNRCA: homeowner roofing questions (opens in a new tab)

Will I need new roof decking?

No. Deck replacement should follow the observed condition and the requirements of the selected assembly. A reroof can reuse suitable decking while repairing identified areas; the final extent may not be visible before removal.

Read full answer: Does a new roof mean all new decking?

GAF explains that damaged decking may be discovered during tear-off and can change the initial quote. Decide how that change will be handled before work starts: what evidence is recorded, how quantities are measured and who can authorize the additional work.

A complete change record should locate the affected area, describe the finding, identify the proposed material and show the price basis. If the finding suggests a structural issue beyond the agreed roofing scope, identify the required specialist review rather than treating a roofing allowance as an engineering decision. Keep approved changes with the original contract.

Primary referencesGAF: roof decking and reroofing (opens in a new tab)

Are flashing and roof edges included?

Ask for a junction-by-junction answer. The proposal should distinguish new work, proposed reuse and excluded details, with a reason and a compatible connection to the new covering.

Read full answer: Which flashings and roof-edge details are actually being replaced?

A roof can have wall steps, chimney connections, valleys, pipe penetrations, skylights and edge metal that are difficult to describe with a single phrase such as 'all flashing included.' Photograph or name the relevant locations and ask how adjoining siding, masonry or equipment affects access.

GAF identifies flashing as a separate component that directs water at vulnerable junctions. The appropriate detail comes from the selected system and existing building conditions. Reuse should be an explicit decision based on condition and compatibility, not an assumption hidden in the price. Include the responsible trade where opening an adjoining finish is necessary.

Scroll the comparison to see every column.

Build a flashing decision schedule
LocationProposal must stateOpen question
Wall or chimneyNew / reuse / excludedAccess to adjoining finish
Vent or skylightProduct and tie-in boundaryWho handles the fixture
Eave or valleyEdge and drainage detailConnection to retained work

Primary referencesGAF: the parts of a residential roof (opens in a new tab)GAF: common roof-leak causes (opens in a new tab)

What about ventilation and ice buildup?

A new covering alone does not establish the cause of an attic or ice-related problem. Review the roof assembly, air leakage, insulation and ventilation together before assigning a remedy.

Read full answer: Will a new covering solve ventilation or ice-related moisture?

Describe where moisture appears and whether it follows rain, cold weather or snowmelt. Existing intake paths, exhaust outlets and interior moisture sources may need a different review from the replacement covering. ENERGY STAR treats attic air sealing and insulation as coordinated improvements and suggests professional assessment where appropriate.

Ask which attic observations were made, which parts could not be accessed and whether the roofing proposal includes any related work. A recommendation to add vents should identify the assembly and intended airflow path. Keep insulation, exhaust-duct or other trade work visible in the scope so it is neither assumed complete nor accidentally omitted.

Primary referencesENERGY STAR: attic air sealing (opens in a new tab)GAF: condensation and roof moisture (opens in a new tab)

How will my home be protected during the work?

Agree on the work sequence and property constraints before materials arrive. The plan should identify protected access, staging, daily weather decisions and how the building is left between work periods.

Read full answer: What should be settled about access, weather and protection?

Walk through deliveries, parking, landscaping, pets, entrances and any equipment or spaces that must remain usable. Tell the team about interior uses that are sensitive to debris, noise or interruption. A steep driveway, restricted access or occupied commercial entrance can change the practical sequence even when the roof area is unchanged.

Ask who supervises the work and who communicates a change in plan. Manufacturer instructions and actual conditions govern installation decisions; a promised calendar date should not substitute for suitable conditions. Put weather interruptions and temporary protection responsibilities in the conversation without assuming a universal installation temperature or a guaranteed completion duration.

Primary referencesNRCA: selecting a roofing contractor (opens in a new tab)

What happens when the roof is finished?

Request a closeout file that connects the finished scope to the approved proposal, changes and written product or workmanship terms. A completion photo and a long warranty label do not replace that record.

Read full answer: What should I receive when the replacement is complete?

Reconcile the base work, approved extras and items intentionally left outside the project. Ask for the selected product identification, relevant completion photographs and any required permit or inspection records. Keep invoices and installation dates where a future owner or warranty claim can find them.

Read the actual warranty documents rather than assuming a manufacturer brochure describes the coverage purchased. NRCA cautions that warranty length alone does not establish performance or suitability. Identify who is responsible for registration or transfer steps, if applicable, and retain confirmation. Resolve an unfinished item on a dated list with a named next action.

Primary referencesNRCA: understanding roof-system warranties (opens in a new tab)GAF: warranty claim documentation (opens in a new tab)

Explore roofing materials

The surface you see.
The system beneath.

Get a closer look at shingles, metal, tile and commercial membranes. Rotate a sample, separate its layers and see what goes into the roof.

Roof material studioPreparing sample
Asphalt shingles example roof assembly with four separated layers
Decked steep-slope example

Drag to rotate. Select a numbered layer to look closer.

Homes / steep-slope roofs

Architectural asphalt shingles.

Dimensional texture, a broad color range and impact-rated options for Colorado homes. Overlapping courses shed water over a coordinated deck, underlayment and flashing system.

What we review with you
  • Architectural profiles & impact-rated options
  • Deck repairs, underlayment & ventilation
  • Starter, ridge, valleys & wall flashing
Explore shingle roofingDiscuss this material

Simplified example assembly. Not to scale or an installation detail. Actual layers, attachment, flashing, ventilation and drainage depend on the building, selected products and project requirements. Impact ratings describe a test result. No roof is hail-proof.

Roofing manufacturers

More choice for your roof.

Compare products from established roofing brands. Our team helps you choose the materials, colors and assembly for your property.

Before the work is scheduled

Agree on the roof.
And the whole plan.

Your estimate should explain the installation, the property protection and how additional work is authorized.

YOUR WRITTEN PROJECT SCOPE

Roof Replacement

01

Materials & agreed work

02

Access, protection & schedule

03

Changes, cleanup & written terms

Use the estimate comparison guide
  1. 01

    Existing roof review and tear-off extent

  2. 02

    Roof covering, accessories and color selection

  3. 03

    Decking allowances and change authorization

  4. 04

    Eaves, valleys, wall flashing and penetrations

  5. 05

    Ventilation review and permit responsibility

  6. 06

    Protection, disposal, cleanup and warranty terms

Additional work and concealed damage follow the authorization process in your written agreement.

Roofing questions, answered

Questions before replacing your roof?

Have a question about your property?
Talk with our team

How much does a roof replacement cost in Colorado?

Roof area, pitch, access, existing layers, deck condition, materials and local requirements affect the price. HOVER or EagleView reports support measured quantities; an assessment and the actual assembly are still needed for a property-specific proposal.

Can you install impact-resistant shingles?

We can price suitable impact-rated products and identify the proposed model and rating. An impact rating does not make a roof hail-proof. Ask your insurer whether the specific installed product qualifies for a discount before relying on savings.

How long will my roof replacement take?

Size, pitch, access, weather, inspections and concealed damage affect duration. We discuss the project sequence and proposed schedule after reviewing the property rather than promising every roof will be completed in one day.

What warranty comes with the replacement?

The proposal identifies any workmanship coverage and the applicable product warranty. Manufacturer system warranties may require particular components, installer authorization, registration or inspections; the offered coverage must be confirmed for your actual project.

Let’s talk about your roof

Tell us about
your roofing project.

Share the Colorado location, what you need and when you need it. Our team will help you understand the next step.

(720) 325-9473

Active leak? Call to confirm availability.

Start your roofing project

Get a roofing estimate.

Tell us where and what you need. No obligation.

Add project details or a plan link (optional)

Prefer email? Send photos or plans directly.

Call (720) 325-9473 Text us Email us