A commercial roofing bid checklist

Organize the bid package, quantities, assembly, occupied-building constraints, alternates and closeout before pricing a commercial roof.

Actual OpenTakeoff roof-plan excerpt for Fountain Fire Station 4, with blue roof-zone boundaries, edge traces and counted roof items on drawing A8.0.
Fountain Fire Station 4 · A8.0 · roof plan · Addendum 3. Working takeoff study. Drawing scale and quantities are pending final review.
Visual field note 05 / Commercial takeoffs

Area. Length. Count. Keep them separate.

Example roof quantity indexNot measured
A commercial roof quantity plan separates areas, edges and counted detailsTwo roof zones A and B are shown schematically. Reference 01 identifies roof area in square feet. Reference 02 identifies perimeter length in linear feet. Reference 03 identifies individual rooftop penetrations and curbs counted each. No measured quantities are supplied.AB010203
01 Areas SF
Roof zones, tear-off and specified assembly layers.
02 Edges LF
Perimeter, coping, transitions and other linear details.
03 Details EA
Record curbs, drains and penetrations as separate counted items.
Keep the basis
Drawing reference · specifications · addenda · open questions

Example quantity map. Use the project drawings and roof measurements to build your own takeoff.

Establish the documents you are pricing.

Create a document register before measuring. Record the drawing set, specification sections, issue dates, addenda, bid instructions and any mandatory visit. Identify which documents govern when an assembly note and a detail appear inconsistent.

Keep unanswered questions in a bid log. Record the question, the source detail, the person responsible for an answer and the date needed. State the assumption in the bid if it remains unresolved.

  • Project address, owner or GC contact and deadline
  • Drawing and specification revisions; acknowledged addenda
  • Required site visit, qualifications, bid forms and submission method
  • Scope boundaries, alternates, unit prices and required exclusions

Measure areas and details as different quantities.

A roof area does not describe its perimeter, curbs, drains or penetrations. Separate square-foot items, linear-foot items and counted details. Tie each quantity to a roof zone, drawing reference and measurement assumption.

Aerial reports and plan takeoffs can support the measurements. They do not establish concealed deck condition, wet insulation, the exact existing assembly or every field dimension. Mark the checks that require site review.

Quantity groupExamples to record
AreaRoof zones, tear-off, membrane, insulation and cover board
LengthParapets, edge metal, coping, expansion joints and transitions
CountCurbs, drains, scuppers, pipes, supports and roof access
AllowancesDeck repair, moisture investigation and defined concealed conditions

Price an assembly, including its attachment.

Trace the proposed system from deck to weather surface. Record each layer, product or performance requirement, thickness, attachment method and detail. Confirm which components are included in the offered system warranty.

Identify moisture evaluation, tear-off versus recovery, temporary weather protection, insulation layout and drainage design responsibilities. Treat these as explicit project questions; a generic membrane price cannot answer them.

  • Existing assembly and investigation limits
  • Deck preparation and repair assumptions
  • Insulation and cover board where specified
  • Membrane attachment, seams, flashing and edge securement
  • Approved details, tests, inspections and manufacturer requirements

Plan around the occupied building.

Review delivery routes, staging, lifting, parking, tenant communication, odors, noise, access and protection of the building below. Coordinate rooftop mechanical work and any required shutdowns with the responsible trades.

Finish the bid with a clear schedule basis, change process, exclusions and closeout list. Keep daily documentation, punch-list work, maintenance information and the offered warranty documents within the project plan.

What changes when an addendum arrives after the roof takeoff?

Treat the addendum as a document revision, not a note stapled onto the old total. Record the affected drawing, specification, detail or bid instruction and identify which roof zones and cost lines change. Keep the earlier takeoff so the quantity difference is explainable.

Review schedule, required products, attachment, insulation, details, forms and alternates as well as roof area. An unchanged membrane quantity does not prove an unchanged bid. Resolve discrepancies through the project’s authorized question process and record any remaining assumption clearly.

Revision recordWhat to capture
SourceAddendum number/date, drawing or specification reference.
Quantity effectAdded, removed or revised SF, LF, EA and layers by zone.
Pricing effectRevised product/crew quote, expiry, freight and scope inclusions.
Bid effectAcknowledgement, form, alternate, timing or qualification changes.

Can a correct roof area still produce an incomplete commercial bid?

Yes. The measured field can be correct while parapet flashing, coping, curbs, drains, protection, equipment coordination or wet-material investigation remain missing. Review the entire roof assembly and its interruptions. Each quantity needs a work description and a pricing basis.

Ask the estimate to distinguish a verified supplier or subcontract quote from a catalog reference or an unpriced allowance. National unit-cost libraries can organize scope, but their geography, price date, unit basis and included components need review before using a dollar value. A cost recipe per 100 square feet is not a rate per one square foot.

  • Keep SF, SQ, LF, EA, LS and any recipe basis explicit.
  • Do not add crew cost again when an all-in assembly rate includes it.
  • Record missing prices and quote qualifications before calling the estimate complete.
  • Separate bid preparation from a commitment that project qualifications have been met.
References & next steps

Sources and further reading.

This guide is general project-planning information. Use current official instructions, the selected product’s documents and property-specific professional review for the actual work.

Keep exploring.

PlanningHow to compare roofing estimatesMeasurementsRoof measurements, squares & wasteColoradoColorado roof permits: where to start
Put the information to work

Now let’s look at
your Colorado roof.

Bring your questions, measurement report, photos or plans. Our team can help turn the next step into a property-specific roofing proposal.